Travel and transport blocks paralyzes

Arganzuela neighborhood, Madrid. An ambulance is removed from the pass in Paseo de la Delicias. It is ineffective “Waiting to contact the switching board” Comment on 20 minutes Its driver, before realizing that the non -guidance situation “It will hinder.” The chaos that launched the blackout of the electrical network that was reported at the national level along the famous Madrid Street, where citizens travel through the zebra crossings without reference to traffic lights, which are affected by B. “Power Peninsula zero” It was notified and confirmed by Electric Red.

The electrical pieces that were produced after 12:30 pm were paralyzed in all this activity, which requires a network connection. Local companies like Energy stores They cannot make electronic fees because Datáphones are not suitable for work, while supermarkets in the neighborhood begin to reduce curtains, although they keep selling some “bakery” products to the door of trade, always cash. Long lines are observed in the nearest stores.

Electronic products stores are attached to stickers when warning their door from selling radio and portable batteries. The least violating the chance to complete their emergency set before high prices. “It is certain that the cost of its construction is definitely,” Comment on a customer after getting a charged battery. A store actually says there is no offer, “I only have a radio.”

The chaos extends to the roads, as users who use the metro go to taxi drivers who cannot provide most services by lack of connection in Datáphones. Those who are affected as well They try to republish their cars at gas stations.

The rest also affects many health clinics in the neighborhood, which was forced to suspend the appointments even new. “There is no light, I cannot attend patients or cancel their dates” The owner of the dental clinic in this street is verified. No urgency or present recipes can be made, because accidents prevent pharmacies from consulting recipes and prices, thus facilitating the supply.

Certificates begin to participate in the streets. “They got out of the metro and we had to reach the station on foot.” Jesus (45 years old), who was heading to his job. Maria (27 years old) was also developed, which closed a car service workshop that was also closed while waiting for electricity supplies. People talk about what happened on the sidewalks, and in many cases, they offer their phones to call their relatives before it reduces the successive signal on their devices.

Looking at this position, there are a few who come to the nearest treasurer in order to obtain a valid, without success. After the protocol, the bank branches were closed while waiting for requests from operating factories. “I was closed for security”A worker from Panco Santander tells these media. The lack of electricity supplies affects automatic ATMs, which are blocked, as well as Datáphones, which are blocked and families resorting to the money they have at home.

Source link

Related Articles

Back to top button