Times Now Navfart, Times Navbarath News, Namami Ganga, Pure River, Namami Ganga Project, Link River Project, Namami Ganga Cost, Enemy on Clean River

Namami Kale Cost

(File Photo)

Delhi: Opposition MPs raised the sluggish speed of plans to connect rivers, and the low cost of the Namami Ganga project and the lack of adequate water life in the Lok Sabha on Wednesday. Dravida Munara Gajakam (TMK) Baloo said that during the 2014 Lok Sabha election campaign, the current Prime Minister Narendra Modi pledged to add rivers to the intermediate level while participating in the discussion on subsidies for the Ministry of Hydro Electricity for 2025-26. But no plans have been made yet to connect the Himalayas rivers and peninsula rivers. He said the DPR (detailed project report) has not yet been made.

5 crore families have water connection through pipeline

He presented the Ken-Fetwa River Contact Plan between Uttar Pradesh and Madhya Pradesh (Ken-Bethwa River Connection ProjectReference), “We are not against it.” It was announced that it would spend over Rs 9,000 crore, but we would like to know when the project will be completed. Water Life Task (Jal Jeevan MissionUnder) 80 % of projects have been completed so far, and only 15 crore families have been provided with water connections from the pipe.

The TMK MP said that Rs 70,000 crore has been allocated in the last fiscal year, but the government has spent only Rs 20,000 crore. About 50,000 crores has not been spent. This means the government is not really interested in it. I would like to know why Rs 50,000 crore has not been spent yet?

How effective is the clean India task?

Congressman Rahul Rahul Kaswan questioned the Water Life Mission and Swach Bharat Mission (Swach Bharat Mission) The benefit of reaching people in real sense. He said there was a shortage of water at the ground level. Also, complaints about water quality are heard. He focused on the need to focus on irrigation and the need to connect the rivers in the last 10 years. Under the Namami Ganga project, only Rs 4,016 crore was spent from 2015-16 to 2021-22, which was only 20 per cent of the budget allocated to this item.

Jumla assured two crore work

Trinamool Congress’s Bobby Haldar Namami said that thousands of crores of rupees had been spent on the project, but where did the money go? It should be investigated. Water Life Mission in 2019 begins with every family of 2024 pure drinking water (Pure drinking water) Done for providing, but what happened to that ‘warranty’? Two crore jobs each year (Haldar said (Two crore jobs) It promised to give it. It was said that black money would come back. Similarly, this is a jumla (supplying pure water). The Trinamool Congress MP from West Bengal has called for a special set of Ganga Sagar Mela.

What did the government do for flood control?

According to the Samajwadi Party’s Virendra Singh, the rainwater is not well managed and the farmers do not get drinking water for irrigation in many places. However, Janata Dal (United) has praised the beautiful Anand Nazi Jeevan Mission to relieve women from the difficulties of water protection. During the monsoon, thousands of people have been affected by floods in Bihar and Kandak rivers in Bihar, demanding the creation of bundles and dams for flood control.

The JD (U) MP in Nepal should be able to resolve this problem every year to end the flood crisis in Bihar. DDP’s B Nagraj also participated in the discussion.

Country and the world’s latest news (There is no message) Read more in Hindi, all the big messages Times now Navbarath Live TV But. Nation (India news) Updates and elections (Elections) The Times is now related to the latest news.

Source link

Related Articles

Back to top button