Big Event in Bhopal: Prime Minister Modi will show a green signal to Indore Metro

Prime Minister Narendra Modi will attend the 300th birth anniversary of Lokmada Devi Ahiliyabai on Saturday. The conference was held at the Jamburi Ground in Bhopal. In addition, they will perform the Virtual Bhumi Pooja of the Got construction work to be built at a cost of Rs 778 crore in the Ksipra River. In addition, the Prime Minister will be constructed at a cost of Rs 483 crore. The conference will include Governor Mangubhai Patel, Chief Minister Mohan Yadav and Union Cultural Minister Gajendra Singh Sekawat. The Ministry of Trade Union Cultural is also significantly coordinated at the event.
At the Women’s Empowerment General Conference, Prime Minister Narendra Modi will publish postal stamps and coins dedicated to Devi Ahiliabai. Prime Minister Modi Honor will be a female artist in the field of tribal, folk and traditional arts with the Rashtriya Devi Ahiliyabhai Award. On this occasion, he will also look at the exhibition on the basis of the good governance, women’s power and culture of Lokmada Devi Ahiliabai organized by the Cultural Department.
300 rupees will be released
Prime Minister Modi will deliver the first 300 rupee memorial currency at the Women’s Conference held at the 300th birth anniversary of Devi Ahiliabai in Bhopal on May 31. The Ministry of Finance has issued a gazette notification in this regard. Weighing 35 grams, this coin will be 50%of the amount of silver. On one side of the coin there will be a picture of Ahiliabai. ‘Ahiliyabai Holkar’s 300th Birthday Anniversary’ will be written in Hindi and under the upper circumference in Hindi. 1725-2025 marked on the left and right side.
On the other hand, the price will be written with the identity of the rupee under the Ashoka pillar. The right left of the Asoka pillar is written in Hindi and English. This is the first coin to be published in the country and the world worth Rs 300. Prime Minister Narendra Modi will also release a special postage on the 300th birth anniversary of Lokmada Devi Ahiliyabai.
Earth Poojan and Local
Prime Minister Narendra Modi will perform the Bhoomi Pooja for the construction of the Simhasta Mahabharva on 2028 from Bhopal to Virtual Ujjain on May 31. This construction is 29 km from the Sani Temple to the Nakta Bypass. Bhoomipujan of Barreyj, Stop Dams and Vent Coswits will be made at a cost of Rs.
The repair work of the Kalia Stop Dam will be started by the Municipal Corporation at a cost of Rs 1.39 crore. These water structures are being built to bathe the devotees and saints and saints safely.
The deadline for this ambitious project has been kept for 30 months, so that all the facilities are fully available during the Simhasta Mahabhava. This program will further strengthen the religious and cultural importance of Ujjain. It is a great convenience for millions of devotees in the Simhasta Mahabharva.
Datya Airport
Prime Minister Narendra Modi will open the newly built Data Airport from Bhopal. The airport will provide a new aircraft for the development of Datia, which will facilitate pilgrims in transport. Arrangements have been made for drinking water, tents, safety, parking, cleanliness, medicine and ambulance. Considering the heat, arrangements have also been made for ORS packets, temporary hospitals and shock centers. The airport has been spread over 124 acres, which is at a cost of Rs 60 crore, which has long been 1.81 km, two cars and two cars. The 19 -seat flights of the large plane to fly will operate four days a week.
Chutna airport
Prime Minister Narendra Modi will open the Satna Airport from Bhopal on May 31. The modern airport has been built by rehabilitation of Chhatna’s old airspace at a cost of Rs 37 crore. On October 31, 2024, the construction work of the airport was completed at the time. On 20 December 2024, the DGCA was granted a license to operate the airport. The 1200 -meter runway has been made, of which 19 seat aircraft can easily land. Two flights are available at a time of parking. The Ariel Terminal Building, ADC Tower, VIP Lounge, Special Poor Facilities and All Security Arrangements have been completed at 750 square meters at the airport. A total of 5.5 km of the airport is manufactured for safety. At the beginning of the airport, the entire Vindhya region, including Satna, will have new opportunities for the development of industry, tourism, education and health sector.
Indore enters a new era
Indore, the pure city of India, is going to enter a new era. PM This is part of the Super Broerty corridor of the yellow line. There are five stations, Gandhinagar Station, Super Coridar 6 stations, 5 stations, Super Corrections 4 stations and Super Caritar 3 stations. This sidewalk will reduce transport and pollution, as well as a comfortable journey to passengers. The Super Priority corridor is not only a technical importance, but also a symbol of the direction of moving towards the modernity of Indore.
31.32 km of Metro Project in Indore
The Indore Total Metro Project is 31.32 km long. This includes 22.62 km high and 8.7 km underground metro. There will be 28 stations in the yellow row of the metro, which will make urban travel easier, faster and environmentally friendly. The price of the 31.32 km of the Metro is about Rs 7500 crore. Initially, the 6 -km corridor is being opened, which costs Rs 1520 crore. This project is an important step for transforming Indore into a modern and environmental friendly city.
Permanent buildings to the panchayats
The first installment will be replaced at a cost of Rs. By constructing the Atal village goodwill buildings, the Gram Panchayats will get the facilities of the permanent building. The Gram Panchayats will be assisted in administrative tasks, arrangements and registration administration.