Namo Bharat-Hasrat Nizamuddin Railway Station, Sarai Kale Khan Fob ended directly; 12 Escalators and 4 lifts ready

Fob completed by Sarai Kale Khan Station
Delhi: The civil construction work of the Call Over Bridge (FOB), which connects the Sarai Kale Khan Namo Bharat Station to the Hazrat Nizamuddin railway station, is now completely completed. The National Capital Regional Transport Corporation (NCRTC) has established six passengers in this 280 -meter FOB, which has completed its installation work. This FOB will help travelers easily between two main transport instructions. Once the FOB construction work is over, the NCRTC has removed the barrier from the road to the railway station, and the entire road has been opened to the public. Also, it has been improved by placing a black peak of coal tar on this road. Considering the most crowded and high traffic in the Sarai Kale Khan region, it is considered an important endeavor, which will not only improve traffic but also increase the life bicycle of the road.
To receive this benefit
The need for a safe and soft foot bridge was felt between Sarai Kale Khan and Hazrat Nizamuddin railway station. Now through the Fob, travelers who travel with women, the elderly, the children, the disabled and the heavy goods can come safe and comfortable.
In the absence of a proper connection between public transport, passengers must cross the roads, risking their lives and preventing traffic. Millions of people travel daily due to various public transport mechanisms in Sarai Kale Khan, but due to excessive congestion and irregular traffic, travelers have difficulty achieving one way to another. The new FOB has a long -term solution to this problem.
The pink line of the Delhi Metro will also be attached
Sarai Kale Khan Station, one of the major stations of Delhi-Kasiabad-Meerrett-Meet Namo Barider, will soon be able to provide a uninterrupted connection with the Pink Line of the Delhi Metro, Hazrat Nizamuddin Railway Station and Veer Hakikat Roy ISBT. Currently, the roof of the station is underway. For the convenience of passengers, 12 escalators and 4 lifts are installed, which are ready for operations.
The operating system is installed on the door platform. Finishing at the five entry-set points of the station and the escalators and lifts are installed on them. The 4.5 km section of Sarai Kale Khan is considered important for passengers from Meerut in the direction of Delhi. The test runs have been launched in this category from Sunday 13th, which will soon be added to the passenger service.
Country and the world’s latest news (There is no message) Read more in Hindi, all the big messages Times now Navbarath Live TV But. Delhi (Cities News) Updates and elections (Elections) The Times is now related to the latest news.