Lula codes temporary measurement of electric sector version | The economy

Republic President Luiz Inacio Lula Da Silva, 21 signed on Wednesday, temporary measurement of the power sector reform, mines and fuel minister Alexander Silvira. Lula Senate president David submitted to Alcolambrre (Unio Brassil-AP), which is the final design of the proposal Free in tariff For millions of people and opening the market Low voltage.

The meeting, which began at dawn, tries to deal with the processing of the text in the Planeto Palace and the Congress. According to reports, the Senator Eduardo Braga (MDB-AM) is being quoted for a prominent performance in a temporary measure with the version of the power sector, although no decision has been made.

In addition to the Reporture, other important positions: the position of the chairman of the mixed committee for the MP and the reviewer reporter. Braga was one of the leaders who attended the meeting on Wednesday.

It is suitable for having an experienced name in the power sector. He served as Mines and Fuel Minister from 2015 to 2016. On the other hand, the Senator of the MDB is already focusing on the ties of the second project that controls the tax reform in the use of tax reform.

In addition to the Alcolambray and Braga, the meeting is attended by the Mines and Fuel Minister, Minister of Institutional Relations, Alexandre Silvira, Glysi Hoffman and Government Leaders of the Senate, Jacques Wagner (PT-BA), and Congress, Randlface (PT -AP).

See more

(((((Standard to).



image




In addition to Master Damasseno, see who is the wTO thinking artists
The largest cultural award in the country was held in Rio de Janeiro and president Lula attended

Along with this issue, people have also spoken to Glysi Silvira about the processing of the text in the Congress. In this case there is an idea of ​​neglecting the proposal or the entry of alien themes. The power sector usually provokes great interest from members of Parliament.

Alexander Silvira spoke about “words changes” in the text of the power sector reform earlier this month, already with the approval of the Civil House. Although preventing the inclusion of new items in the text, the MP can bring more details of the already included items.

One example, in the long run, the use of the network for the consumer section with discounts, especially the use of the reduction and distribution system for the payment of transmission system use charges. The measurement does not have a retreactive effect and only affects signed contracts after the text is published.

The problem already monitored is a race for new contracts – to guarantee a reduction before publishing the text. The names of the private sector are heard Broadcasting .

However, to prevent this “race”, the government must set up a lock in the text. Change in the market starting schedule for low voltage is a ventilated change. The government can cause the cans for 2026.

For mines and energy mines released last month, the proposed schedule has been provided for access to a group of large consumers from March 1, 2027 to March 1, 2027, for access to a group of large consumers, for the entire consumer market, including small trades and homes, from March 1, 2028.

Source link

Related Articles

Back to top button