Home Sports Barcelona initiates new works and confirming limits and changes in public transport...

Barcelona initiates new works and confirming limits and changes in public transport from now on

2
0

This Tuesday, April 22, They started the urbanization of streets and services in the vicinity of Ken PharigolaCalled the Walcca Services Ring. The project includes environmental standards of urbanization and Mary de Dell Coal, Pharygola, Medes, Cambrills, L’Oozerera and Calendou streets.

Works in the area more than the urbanization of the service ring 8,000 square meters.


Baryo de Ken Farigola de Walcarka Works

Barcelona City Council

At the same time, Urbanization tries to produce a friendly place with vegetation and shadow presence, 70 new trees garden, as well as shrubs in the road adjacent to the road. This means that this is a significant growth so that the vegetation is not practical right now. Splints have stable drainage systems (SUD) to hold storm water, which are naturally driven towards partition.

These works include the restoration of all public lighting, Construction of services such as the extension of the sidewalk or the Numatic Waste Collection. The urbanization of the service ring is indispensable for the development of housing promotions provided in this area. Specifically, in this place, the Municipal Housing and Rehabilitation Institute of Barcelona (IMHAB) The construction of two new promotions in 2027 plans to begin It adds more than 40 homes between them.

Also read

The first stage of works: effects

At the same time, these works are carried out in stages, without affecting the entire area. The first step is expected to be extended until the beginning of next year, It will cover Marre de Del Dell Coal Street and It can be implemented in four different sections to guarantee access to neighbors and emergency vehicles.

All the time, neighbors can access Marre de Dell Coal from Pharigola or Mudes streets Trimmed by street work. In this way, the vehicles are not allowed to the Walkcarka Avenue and the Terror of Argentine Republic Avenue is diverted by Torrent Del Rmai, Sunt Yudald, Plana de Mons, Viaduct de Walkka and Argentina Republic. AlsomOr, a sense of traffic on Les Balers street is changed to facilitate local travel.

The steps of Barrio de's works are pharigola de valcca

The steps of Barrio de’s works are pharigola de valcca

Barcelona City Council

Thus, between this street and the 117th number, until the end of July, these works begin in the section of Marare de Dell Coal. From there, it is in the opposite side, in the intersection of the Law Pharigola de Walkkka School in the area, without affecting the school activities. After the summer and until the beginning of next year, The rest of the mare de de de de de will continue to work and also operate on Callandou Street.

The Corte of Our Lady of the Cole It also affects the bus travel 87. In Sentido Bajada, Call Mare DD DE Dell is emitted until 87 Plaza is reduced, but we have to discuss the works, the rest of the vehicles, the rest of the vehicles, the Torrent Dell Rmai, Sant Yoodald, Plaza de Mons, Valalca and the Urgentine Republic. Stops are in line with a new tripWith two new stops in Sant Yudald and two new stops in the Argentine Republic.

Since 2026, after the first phase of contributions were completed, The following steps will be fixed.



Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here